0
Qualify
Go or no-go, in writing
Base success rate, fit against the current evaluation criteria, whether the topic returns next year, national co-funding for your preparation, a written go/no-go.
When T−6 months
Innovation · Proposal engineering
Proposal engineering for collaborative research. The argument, the consortium, the budget, the evidence and the documents, built as one system — from the call text to the submit button.
Latest build
Cluster 2 lump-sum RIA, submitted 2026
Why proposals fail
Most proposals are not lost on the quality of their ideas. They are lost on the machinery around the text.
Competition has sharpened. Horizon Europe success rates fell to about 12–14 % overall, and Cluster 2 single-stage calls to about 7 % in 2025 (Science|Business analysis of Commission data). At those rates, every avoidable weakness is disqualifying.
The method
T is the call deadline. Four systems run through every stage: document control, visibility, AI discipline and programme control.
0
Qualify
Base success rate, fit against the current evaluation criteria, whether the topic returns next year, national co-funding for your preparation, a written go/no-go.
When T−6 months
1
Decode the call
Verbatim capture checked across page breaks; every research question mapped to an objective, section and instrument; the template’s hard rules; a post-mortem of past winners; a map of related projects.
When T−5 → T−4 months · re-verified at T−90/60/30
“Verbatim first. We capture the call word for word and trace every rule, quote and figure to its primary source.”
One of seven principles
2
Architect the consortium
Partner qualification gates, graded roles (beneficiary, associated partner, advisory board), institutional roles, governance clauses that survive stress, an Advisory Board recruited by function.
When T−5 → T−2 months
3
Design the evidence and work plan
Work packages derived from how the work actually runs, a payment profile per reporting period, a solidity matrix, a quality gate per evidence strand, a naming system, an ethics and data regime.
When T−4 months → freeze at T−45 days
4
Build the budget
An effort model per partner and work package, unit-cost build-ups using public price indices, partner-budget intake with error flags, proportionality tests, a cash-flow check per partner, an independent recompute.
When T−60 → lock at T−14
“Assert, don’t assume. Every scripted change states what it expects and stops if reality differs. Every total is recomputed.”
One of seven principles
5
Write and engineer the Part B
Drafting inside the official template, impact written for the current rules, page-limit engineering, figures generated from the proposal’s own tables, a verified and linked reference system, a compliance audit.
When T−90 → freeze at T−7
6
Run the consortium
Partner kits, one-pagers, a living requests register, a secretariat across every channel, meeting briefs, a written decision trail.
When Continuous
7
Submit
Portal entry from a single execution map (the portal follows the Part B), budget justifications, ethics pages, a consistency check, full upload at T−5, a checked PDF.
When T−10 → T
“Keep a contingency line. Any partner not signed off a month before the deadline gets a version of the proposal built without them.”
One of seven principles
8
After submission
Public status, a visual summary, a publication plan, a lessons note, grant-preparation readiness.
When T+1 → result
Start here
Three fixed-scope readings: of the topic, of a rejected proposal, or of your full draft as an evaluator reads it. Each quote states the success rate for your call.
Full builds
All nine stages, from qualification to submission, with two red-team rounds. Fixed scope, milestone payments, no success-only fees.
Eight fixed-scope modules, each a stage of the method that can be bought on its own: for a coordinator with a team in place, or a partner who only needs their own sections done right.
Your organisation’s sections, budget line, one-pager and portal inputs.
Effort model per partner and work package, unit-cost build-ups, partner-budget checks, payment profile and cash flow, written justifications.
Partner qualification, roles, governance clauses, partner kits and one-pagers, a requests register.
Seats defined by function, tailored invitations, verified delivery, written acceptances.
Tiered literature review, verified reference registry, reproducible gap analysis, state-of-the-art text, citation audit.
Portal entry with you from one execution map, budget comments, Part A–Part B consistency, a checked PDF with working links, full upload five days before the deadline.
A complete alternative proposal without an at-risk partner, ready to activate.
A consortium site that stays in sync with the proposal, partner pages, status after submission, a visual summary.
Case · Cluster 2 lump-sum RIA · 2026
Fewer than ten beneficiaries in several EU and associated countries, four years, about €4 M requested, about 500 person-months, ten work packages. The project name is withheld pending partner consent.
The original work plan. Nothing paid in the middle period — a design error under lump-sum funding, where the work package is the payment unit.
The same lead author’s previous attempt, in 2025, was a finished proposal that was never uploaded. Most of our rules come from the difference between the two.
Formats · commissioned as packages
Two field-tested formats from the founder’s research, offered to foundations, parties, universities and consortia. Both belong to one approach, embodied–experiential translation: results are turned into situations people go through, not only documents they read.
SMP
A designed encounter between researchers and decision-makers around evidence still in progress, with a recorded restitution. Run since 2022 in Kenya, the DR Congo and Rwanda: science talks, a political panel and questions from the public, streamed live.
GRBC
An experiential training format that reverses gendered role assignments to make competence barriers observable. First run for a week in Madagascar in August 2022: a simulation whose rules were translated from national survey data, set in a society where the roles were reversed.
Published as Somatic Politics (ENoP, 2026) and as a 2022 working paper.
Horizon Watch · checked 28 Sep 2026
Horizon Europe’s calls and deadlines, the evaluation windows, and the negotiation of its successor, FP10. Every entry links to its source: the Work Programme, the Council, the Commission.
Policy · FP10
Presented with the 2028–2034 long-term budget, the proposal earmarks €175 billion for the next framework programme, close to double the current programme's initial €95.5 billion, and keeps it a stand-alone programme tied more closely to the new European Competitiveness Fund.
Source: Science|Business · ERA-LEARN
Calendar
The last two years of Horizon Europe. Cluster 2, Culture, Creativity and Inclusive Society, is Part 5 of the programme.
Source: HaDEA · WP 2026–2027, Cluster 2 (PDF)
Policy · Parliament
The ITRE rapporteur Christian Ehler and co-rapporteur René Repasi publish their draft reports on the Horizon Europe 2028–2034 regulation and specific programme.
Source: ERA-LEARN
Policy · Council
Member States agree a partial negotiating mandate on the regulation and the specific programme. Financial and horizontal questions stay inside the wider negotiation on the long-term budget.
Source: Council of the EU
Calendar · Cluster 2
Single-stage call ‘Culture, Creativity and Inclusive Society 2026’, 17:00 Brussels time.
Source: WP 2026–2027, Cluster 2 (PDF)
expected
Policy · Parliament
Scheduled for September 2026, followed by a plenary vote; negotiations between Parliament and Council can start once Parliament has its position.
Source: Horizon Europe Portal (CZ)
Calendar · Cluster 2
Co-funded European Partnership for Social Transformations and Resilience (COFUND): €60 million, one project. The partnership will fund research on the future of work, social protection and essential services, education and skills development, and a fair transition.
Source: WP 2026–2027, Cluster 2 (PDF)
expected
Results · Cluster 2
Standard timing: applicants hear around five months after the deadline; grant agreements are signed around eight months after it, so late May 2027.
expected
Calendar · Cluster 2
First-stage deadline 4 May 2027; second stage 30 September 2027.
Source: WP 2026–2027, Cluster 2 (PDF)
expected
Calendar · Cluster 2
Deadline 23 September 2027. The Director-General may open a call up to a month earlier or later, and delay a deadline by up to two months.
Source: WP 2026–2027, Cluster 2 (PDF)
After submission
Deadline weeks are billed at €1,150 per day.
Terms in brief
Who we are
Inkoation Research Sweden AB (trading as G·inkoation) is a Stockholm-based research company. It is led by a researcher with a PhD in information and communication sciences, a career in EU research policy and programme management, and published, field-tested methods for collecting and translating evidence: narrative circles, science-meets-politics formats, bootcamps.
We work in English, French and Italian, with working Swedish. The method comes from building a large Horizon Europe proposal under real pressure, and from keeping an unusually detailed record of what went wrong and how it was fixed: nearly 600 lesson records, condensed into 96 operating rules.